Close System Authority Approvals

Al Ain Municipality – AAM

Required documents for AAM approval

A. Administrative Documents:

  • Appointment Letter
  • Owner EID
  • Owner Approval on Design
  • Commercial Registration (in case the representant is a commercial entity)
  • Power of Attorney (if applicable)
  • Undertaking Letter (applicant committing to adhere to authorities conditions and specifications)
  • Contractor’s License

Required documents:

  • Site Plan
  • Architectural Drawings
  • Structural Drawings and Calculations
  • Civil Defense Preliminary Drawings
  • Electrical Drawings
  • No-objection Certificates NOC report by relevant authorities (ADCD, DOT, ADDC water, ADDC power, ETISALAT, EITC-DU, ADSSC, ADNOC, DOH,..etc)

Want to speed up this approval? We’re here to help!


en English
X